Attention points when installing the rotary screen cleaning machine
PRODUCT NEWS 2024-10-17
When installing the rotary screen cleaning machine, the following points sho

When installing the rotary screen cleaning machine, the following points should be noted:

Grid well width, depth, and maximum water depth: These dimensions determine whether the installation space of the equipment is suitable, ensuring that the equipment can adapt to the specific situation on site.

Gap between grid bars: This affects the filtering effect of the grid cleaning machine, and the appropriate gap needs to be determined based on the size of impurities in the actual treated wastewater.

Attention points when installing the rotary screen cleaning machine

Installation angle: usually between 60 ° and 75 °, which is related to the efficiency of equipment operation and the removal effect of dirt.

Slag discharge height: This determines the ability of the equipment to remove dirt, and it is necessary to ensure sufficient height to smoothly discharge the dirt.

Electrical control requirements: Set the corresponding start stop frequency and single cycle time according to the user's needs, and also control the equipment operation based on the liquid level difference before and after the grid.

Equipment material: If there are special requirements for equipment material, such as corrosion resistance, they should be specified when ordering.

Motor power: The motor power needs to match the working requirements of the screen cleaning machine to ensure stable operation of the equipment.

Groove depth and width: These size parameters affect the installation space and processing capacity of the equipment, and it is necessary to choose the appropriate size according to the actual situation.

Equipment overall width: This is related to the installation position of the equipment in the grid well, and it is necessary to ensure sufficient space for installation and maintenance.

Sink depth: The sink depth needs to be determined based on the actual water depth and treatment requirements to ensure that the equipment can effectively intercept and remove pollutants.

During the installation process, it is also necessary to ensure the stability and safety of the equipment, including details such as fixing the base, connecting cables, fixing the water outlet pipeline, and installing the screen cover. At the same time, it is necessary to consider the electrical wiring of the equipment, ensure that the electrical supply is consistent with the required voltage of the equipment, and carry out electrical wiring according to design requirements. Finally, after installation, a trial run is required to ensure that the equipment can operate normally and to check whether various indicator lights and instruments are functioning properly.


 